Bulkhead Repair Conceptual Plans

Bulkhead Repair Conceptual Plans

Port of Siuslaw Manager, Robert Forsythe, received conceptual plans and technical drawings today for the much needed repairs to the Siuslaw River bulkhead.   ZCS Engineering, Inc. was awarded the contract to prepare the preliminary designs for the Port; a survey and...
Fuel Dock Open

Fuel Dock Open

The Fuel Dock is now open.  Hours will be 8:30 – 4pm daily.  Fuel prices: Non-ethenol gas $4.379, Diesel $3.839. For more information, contact the Port office 541-997-3426.